Deliverables

Work Package 1 - Management of the project and communication with EC

Leader: Trinity College Dublin (Ireland)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
1.1 Web-based Platform for Project Management Support UCC Apr-13 Mar-14 Public
1.2 First Project Review with Commission Auditors TCD Oct-13 N/A Public publishable summary
1.3 First Review of Project and Quality Plan TCD Nov-13 N/A Confidential
1.4 Second Project Review with Commission Auditors TCD Nov-14 N/A Public publishable summary
1.5 Second Review of Project and Quality Plan TCD Mar-15 N/A Confidential
1.6 Final review with Commission Auditors TCD Oct-15 N/A Public publishable summary

Work Package 2 Architecture design and modelling

Leader: Aston University (UK)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
2.1 Initial reference Architecture TCD Apr-13 Feb-14 Public
2.2 First WP2 Progress report ASTON Sep-13 Mar-14 Public
2.3 Updated Reference Architecture TCD Aug-14 Mar-15 Public
2.4 Progress report on traffic and service modelling TCD Apr-14 N/A Confidential
2.5 Second WP2 progress report ASTON Merged with D1.4 N/A N/A
2.6 Architectural optimization for different geo-types ATE Oct-14 Mar-15 Public
2.7 Report on Optical and Wireless Network Integration ALUD Apr-15 Feb-16 Public
2.8 DISCUS end-to-end techno-economic model ASTON May-15 Feb-16 Public
2.9 Final report on DISCUS architecture TCD Oct-15 Feb-16 Public

Work Package 3 - Policies, Standardisations And Regulations, Impact And Dissemination

Leader: Coriant (Germany)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
3.1 Implement Project Website UCC Apr-13 Mar-14 Public
3.2 Initial white papers on regulation/policy and multi-business model support TCD Sep-13 Feb-14 Public
3.3 Initial report on proposals for standards activities and priorities ALUD Feb-14 Mar-15 Public
3.4 Intermediat report/white papers on regulation/policy, wavelength usage and multi-business model supp TCD Merged with D3.7 N/A N/A
3.5 Workshop on DISCUS architectures and supporting technologies TID Oct-14 Mar-15 Public
3.6 Final report on proposals for standards activities ALUD Aug-15 Feb-16 Public
3.7 Final report on regulation, policy and multi-business model usage TCD Jul-15 Feb-16 Public
3.8 Final workshop on DISCUS architecture with supporting demonstrations TID Oct-15 Feb-16 Public

Work Package 4 - Long Reach Access Network And Wireless Integration

Leader: Alcatel Lucent (Germany)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
4.1 Assessment of advanced LR-PON transmission technologies IMEC Sep-13 Feb-14 Public
4.2 System specifications for LR-PON implementation ALUD Nov-13 Mar-15 Public
4.3 Integrated architecture for LR-PON supporting wireless and wireline services ALUD Oct-13 Feb-14 Public
4.4 Optical layer supervision tools and processes for long reach optical access TID Apr-14 Mar-15 Public
4.5 Optimization models for long-reach access networks ATE Apr-14 Mar-15 Public
4.6 Updated specifications for LR-PON system ALUD Oct-14 Mar-15 Public
4.7 Optimization methods and algorithms for long-reach access networks ATE Merged with D4.10 N/A N/A
4.8 Long reach access architecture supporting Open Access and infrastructure virtualization NSN Merged with D4.11 N/A N/A
4.9 Long reach fiber architectures for integrated wireless/wireline services ALUD Merged with D4.11 N/A N/A
4.10 Updated optimization models and methods for wireless/wireline integration atesio Jun-15 Feb-16 Public
4.11 Consolidated long reach access network view ALUD Apr-15 Feb-16 Public
4.12 Design and implementation of a dynamic bandwidth protocol for TWDM-PON TCD Jun-15 Feb-16 Public
4.13 Resilience heterogeneous long reach access networks TID Jun-15 Feb-16 Public

Work Package 5 - LR-PON Critical Physical Hardware Implementation

Leader: TNI and UCC (Ireland)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
5.1 Feasibility report on the burst-mode EDC and the burst-mode front-end Tyndall/UCC Oct-13 N/A Confidential
5.2 Feasibility report on 40Gb/s downstream duobinary transmitter IMEC Oct-13 N/A Confidential
5.3 Report on the performance of the tuneable laser Tyndall/UCC Apr-14 N/A Confidential
5.4 Report on high dynamic range optical amplifier node Tyndall/UCC Oct-14 N/A Confidential
5.5 Report on the Silicon Photonics tuneable filter III-V Oct-14 N/A Confidential
5.6 Report on 40Gb/s downstream duobinary transmitter and 10/40Gb/s APD-TIA test version module IMEC Nov-14 N/A Confidential
5.7 Report on wide dynamic range, burst-mode electronic dispersion compensation Tyndall/UCC Apr-15 N/A Confidential
5.8 Report on the performance of the tuneable laser with integrated modulator Tyndall/UCC Apr-15 N/A Confidential
5.9 Report on power-saving 10/40Gb/s ONU ASIC IMEC Jul-15 N/A Confidential

Work Package 6 - Metro/Core Node Design

Leader: Trinity College Dublin (Ireland)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
6.1 First report on the specification of the metro/core node architecture KTH Aug-13 Feb-14 Public
6.2 Report on the design, and control mechanism of the 3-stage optical switch Polatis Oct-13 N/A Confidential
6.3 Report on the design of the interfaces of the control plane TCD Aug-14 Mar-15 Public
6.4 Implementation of Report on the performance of 192x192 switch matrix technology Polatis Merged with D6.5 N/A N/A
6.5 Final report on the specification of the metro/core node architecture, including reports for D6.4 and D6.6 KTH Jul-15 Feb-16 Public
6.6 Implementation of the OpenFlow control plane for the metro/core node TCD Merged with D6.5 N/A N/A

Work Package 7 - Backbone Network Design

Leader: Telecom Italia (Italy)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
7.1 Power consumption studies ASTON Jan-14 Mar-15 Public
7.2 Optical islands description TI Oct-13 Mar-14 Public
7.3 Network resilience strategies KTH Merged with D7.6 N/A N/A
7.4 Preliminary quantitative results for flat optical network UCC Oct-14 Mar-15 Public
7.5 Control Plane Studies TID Merged with D7.7 N/A N/A
7.6 Core network optimization and resiliency strategies KTH Apr-15 Feb-16 Public
7.7 Consolidated/integrated optical core design TI Jul-15 Feb-16 Public

Work Package 8 - Critical Systems Test And Verification

Leader: TNI & UCC (Ireland)

Deliverable No. Title Lead Delivery Month Release Month Dissemination Level
8.1 Report on the critical system components and subsystems TID Oct-14 N/A Confidential
8.2 Report on the performance of the upstream sub-systems Tyndall/UCC Apr-15 N/A Confidential
8.3 Report on the physical layer solution to provision point-to-point core-capacities over the LR-PON Tyndall/UCC Apr-15 N/A Confidential
8.4 Report on the performance of the downstream sub-systems IMEC Sep-15 N/A Confidential
8.5 Final report on the test-bed Tyndall/UCC Oct-15 Feb-16 Public